SCI Huntington
The maximum security correctional institution houses 2,155 adult male inmates on a site of approximately 60-acres with electrical power distribution upgrades of the four original cell blocks, plus the two newer cell blocks. The project included replacement of existing feeders, wiring, panel boards and switches, including interface with the back-up power systems.
Additional aspects of the project included:
- Analysis & design to meet higher electrical demand
- Selective coordination analysis
- Arc fault current calculations
- All construction work will occur within the secure perimeter
- Phasing will occur to minimize outages
- Construction phase administration