SCI Forest
New the 700,000 SF prison facility situated on a 200 acre site the provides programming, support services and infrastructure for approximately 2,000 inmates. The maximum security restricted housing unit contains 96 cells, and there are nine general population housing units which each have 128 cells.
Project Features included:
- 1800 BHP high temperature hot water boilers and central distribution piping including 4,800 LF of underground piping
- 1200 ton chilled water plant with central distribution piping (4,800 LF underground)
- Campus-wide metering/monitoring system with PLC control of remote circuit breakers featuring touch-screen human interface
- Dual 2000KW diesel generation emergency power plant; 100% backup of entire facility
- A 5,000 LF underground domestic water distribution service main loops the perimeter of the site
- One million gallon elevated water storage tank system
- Fire suppression system including 2,500 gallon per hour fire pump and 5,000 LF of underground eight inch fire water distribution loop