Skip links

Mylan Pharmaceuticals

  • 3 Phase Renovation of the 74 Addition Area at the Mylan Chestnut Ridge Facility
  • Project includes
    • Laboratories
    • Clean rooms
    • Offices and Storage space
  • Renovation to the Suburban Warehouse into three-story Lab Facility
  • The first and second floors are each 9,056 SF and have been designed to be dedicated lab space
  • Third Floor 6,394 SF training/multipurpose space