Erie Insurance

  • New seven-story, 331,357 SF building designed to accommodate up to 1,300 employees
  • Fundamental Commissioning:
    • Commissioning plan development
    • OPR/BoD review
    • Incorporated commissioning requirements in construction documents
    • Developed construction checklists
    • Construction observation/installation verification
    • Construction phase commissioning meetings
    • Develop functional test procedures
    • Witnessed and documented functional performance tests
    • TAB verification
    • Final commissioning report
  • Enhanced Commissioning
    • Commissioning design review
    • Submittal review
    • Training and system education
    • Systems manual preparation
    • Warranty period review and report
  • Electrical
    • Variable frequency drives
    • Lighting control system
    • Fire alarm system
    • Emergency power & ATS
  • Mechanical
    • Building automation system
    • Central chilled water system consists of a three water-cooled variable speed screw chillers piped in a series ‎counter flow configuration
    • Two multi-cell cooling towers located on the roof
    • CRAC unit cooling water system is a closed loop system with 40% propylene glycol solution with three dry-coolers located on the roof ‎
    • Natural gas hot water boiler plant
    • Ventilation is provided by two 100% dedicated outside air supply (DOAS)‎ units
    • Stair pressurization system
    • Toilet exhaust systems
    • Central station VAV air handling systems
    • HW & CW pumping systems
    • Domestic water heating system
  • Other Features
    • Vegetative roof designed to control water runoff and to minimize heating and cooling costs
    • Large collaboration areas
    • Open courtyard
    • Employee kitchens on each floor
    • Pedestrian bridges connecting to the rest of the Company’s downtown campus