Skip links

Carnegie Science Center – Riverfront Extension

  • Master planning for surrounding landscape in order to integrate it into the educational opportunities provided by the CSC as well as connect the landscape to the adjacent sites and attractions
  • Extension of North Shore River Front Trail
  • Site lighting plan and design
  • Site stormwater/drainage design and management
  • Trails and ramps up to ADA (Americans with Disabilities Act) standards and new seating areas
  • The first-floor terrace extending from the cafeteria toward the river trail that provides an opportunity for trail riders to stop for a break and access restrooms, food, and drinks
  • Landscaping featuring rain gardens and a stormwater management system that directly connects to the riverfront
  • LEED Gold