Skip links

Cleveland Clinic

  • 10-year client relationship
  • Multi-phased projects at clinic locations
  • Medical gas system studies, multiple buildings
  • Med air replacement
  • 3rd floor vacuum system replacement
  • WAGD gas system replacement
  • Strongsville vacuum system replacement
  • Isolation room study, campus-wide
  • Isolation room upgrades
  • Isolation room study, Heart Center
  • Research lab renovation
  • Cath Lab/LDR renovation
  • Develop commissioning master specifications
  • Brunswick Emergency Department addition commissioning
  • Cancer Lab renovations
  • Pediatric caesarean delivery and Cath Lab Suite
  • Correct HVAC Deficiencies in Main Pathology Lab
  • Ambulatory Surgery Center Waiting Area renovations
  • Fairview Hospital Cooling Tower replacement
  • Avon Hospital Inpatient Bed Tower commissioning
  • Avon Hospital Rooftop AHU analysis