SCI Forest
- New the 700,000 SF prison facility situated on a 200 acre site that houses approximately 2,000 inmates
- 1800 BHP high temperature hot water boilers and central distribution piping including 4,800 LF of underground piping
- 1200 ton chilled water plant with central distribution piping (4,800 LF underground)
- Campus-wide metering/monitoring system with PLC control of remote circuit breakers featuring touch-screen human interface
- Dual 2000KW diesel generation emergency power plant; 100% backup of entire facility
- 5,000 LF underground domestic water distribution service main loops the perimeter of the site
- One million gallon elevated water storage tank system
- 2,500 gallon per hour fire pump and 5,000 LF of underground eight inch fire water distribution loop