- New seven-story, 331,357 SF building designed to accommodate up to 1,300 employees
- Fundamental Commissioning:
- Commissioning plan development
- OPR/BoD review
- Incorporated commissioning requirements in construction documents
- Developed construction checklists
- Construction observation/installation verification
- Construction phase commissioning meetings
- Develop functional test procedures
- Witnessed and documented functional performance tests
- TAB verification
- Final commissioning report
- Enhanced Commissioning
- Commissioning design review
- Submittal review
- Training and system education
- Systems manual preparation
- Warranty period review and report
- Electrical
- Variable frequency drives
- Lighting control system
- Fire alarm system
- Emergency power & ATS
- Mechanical
- Building automation system
- Central chilled water system consists of a three water-cooled variable speed screw chillers piped in a series counter flow configuration
- Two multi-cell cooling towers located on the roof
- CRAC unit cooling water system is a closed loop system with 40% propylene glycol solution with three dry-coolers located on the roof
- Natural gas hot water boiler plant
- Ventilation is provided by two 100% dedicated outside air supply (DOAS) units
- Stair pressurization system
- Toilet exhaust systems
- Central station VAV air handling systems
- HW & CW pumping systems
- Domestic water heating system
- Other Features
- Vegetative roof designed to control water runoff and to minimize heating and cooling costs
- Large collaboration areas
- Open courtyard
- Employee kitchens on each floor
- Pedestrian bridges connecting to the rest of the Company’s downtown campus