UPMC – Bedford
Boiler and Chiller Replacement
- Boiler Replacement
- Engineering services provided include mechanical, electrical, plumbing, fire protection, and structural design
- Replacement of two coal fired boilers with three 200 BHP gas fired boilers, DA tank, and condensate tank
- Addition of a 10,000-gallon fuel oil tank
- Enlargement of existing door opening to accommodate the new boilers, and modification of the coal storage bin to house the third boiler, which included a new garage door for access and man door for egress
- Chiller Replacement
- New pumping system designed to allow for pumps to operate on VFD based on system pressures
- Larger three way diverting chilled water valves were replaced while the smaller fan coil diverting valves were remained for a future fan coil replacement project
- The modular chillers provided for 8 stages, thus increase partial load efficiencies which the chillers operated the majority of the time
- 100-ton spare capacity for future expansion
- Capacity of the emergency generators were studied and two of the four chillers were added to the emergency system
- Temporary chillers were designed to be connected to the system until testing of the new chillers was completed in case there was a failure of one of the chillers to be demolished