SCI Mahanoy
Repairs and Renovations to Switchgear and Generators
- Engineering services for this project include:
- Upgrade two existing 1 MWCaterpillar generators to two 2 MW generators
- Decommissioning of the existing generators
- Replace generator switchgear, with new switchgear that will has remote annunciation to be located in the adjacent Utility Plant Maintenance Office
- Equipment to assist in the Green Government initiative
- A load study performed for proper sizing of the generators
- Provide two means of installation of generators in lieu of temporary generator(s) during construction
- Ensure new equipment is compatible and works seamlessly with existing equipment and systems
- Replacement of the 4160V switchgear utility breaker A & B and the 480V main electrical distribution panel board chillers & utility plant
- Replacement of the 480V electrical panel in maintenance feeding buildings 1-6
- Replacement of the 480V electrical panel in education building feeding buildings 7-10